Energy
Measure by task, payload, terrain and state.
Deployment evaluation · 16
Count active work, waiting, warm-up, thermal limits, charging, battery exchange and restart within the real shift.
FUURAA thesis
Engineering map
Each layer states the boundary to establish and the evidence needed for the next decision.
Measure by task, payload, terrain and state.
Track derating, cool-down and environment.
Model charging, exchange, queue and recovery.
Verification questions
Each question needs an object, conditions, denominator, threshold and accountable decision owner.
How much energy produces useful work?
Which states consume hidden time?
What changes with payload and terrain?
Can charging preserve safe coverage?
Evidence to preserve
A conclusion alone loses reviewability; raw records, configuration and exclusions matter too.
State-resolved energy trace
Thermal and derating record
Shift-level availability model
Scope boundary
Nominal battery capacity or a no-load endurance test does not establish productive duty cycle.
This is an engineering reading and decision framework; it does not replace application-specific risk assessment, conformity work, procurement acceptance or professional advice.
Sources and evidence status
Source dates and review status remain visible; external sources open in a new tab.
Develops repeatable measures for mobility, manipulation, sensing, endurance, communications, operator proficiency, logistics and safety.
Defines methods for specifying and evaluating locomotion performance of complete legged robots.