Reading method · 03

Evidence

Turn robot claims into repeatable measurements that include failure, intervention, drift and recovery.

Evidence statusEngineering decision framework · cell-specific validation requiredLast reviewed: 11 August 2026
03

FUURAA thesis

A deployment claim is credible only when its measurement boundary, denominator and failure record are visible.

Engineering map

Turn the title into engineering objects that can be observed, measured and reviewed.

Each layer states the boundary to establish and the evidence needed for the next decision.

01

Metric contract

Define the event, unit, denominator, sampling period, exclusions and acceptance threshold before the run.

02

Failure taxonomy

Separate robot, tool, perception, material, upstream, downstream, safety and operator causes without double counting.

03

Traceability

Link software, recipe, tool, calibration, product lot, operator and environmental state to every material result.

Verification questions

Write the questions first, then decide whether a demo, test, pilot or operating record can answer them.

Each question needs an object, conditions, denominator, threshold and accountable decision owner.

  1. 01

    Is the denominator cycles, attempted parts or accepted parts?

  2. 02

    Are manual resets and discarded trials included?

  3. 03

    Can another team reproduce the measurement procedure?

  4. 04

    What changed between the best demonstration and the reported average?

Evidence to preserve

Enable the next reader to reconstruct conditions, results, failures and the decision.

A conclusion alone loses reviewability; raw records, configuration and exclusions matter too.

  1. 01

    Evidence package 1

    Versioned test protocol and raw event log

  2. 02

    Evidence package 2

    Failure taxonomy with time, cause, owner and disposition

  3. 03

    Evidence package 3

    Calibration, software and configuration evidence for every run

Scope boundary

State what this evidence still cannot be generalised to.

Sources and evidence status

Read standards scope, measurement evidence and application conclusions separately.

Source dates and review status remain visible; external sources open in a new tab.