Real-work map · 11

Picking and sortation workflow

Evaluate perception, grasping, placement, verification, rejection and recirculation across the real item mix.

Evidence statusDeployment decision framework · site and workflow validation requiredLast reviewed: 14 August 2026
11

FUURAA thesis

A successful grasp is one transition inside an inventory- and quality-controlled workflow.

Engineering map

Turn the title into engineering objects that can be observed, measured and reviewed.

Each layer states the boundary to establish and the evidence needed for the next decision.

01

Presentation

Record clutter, packaging, deformability and occlusion.

02

Manipulation

Measure detection, grasp, damage and placement.

03

Verification

Confirm identity, count, destination and reject path.

Verification questions

Write the questions first, then decide whether a demo, test, pilot or operating record can answer them.

Each question needs an object, conditions, denominator, threshold and accountable decision owner.

  1. 01

    What item population was tested?

  2. 02

    How are no-picks and double-picks counted?

  3. 03

    What damage threshold applies?

  4. 04

    Can rejected items re-enter safely?

Evidence to preserve

Enable the next reader to reconstruct conditions, results, failures and the decision.

A conclusion alone loses reviewability; raw records, configuration and exclusions matter too.

  1. 01

    Evidence package 1

    Versioned item and packaging set

  2. 02

    Evidence package 2

    Attempt-level pick and damage data

  3. 03

    Evidence package 3

    Reject, recirculation and inventory record

Scope boundary

State what this evidence still cannot be generalised to.

Sources and evidence status

Read standards scope, measurement evidence and application conclusions separately.

Source dates and review status remain visible; external sources open in a new tab.