Real-work map · 09

Goods-to-person workflow

Measure the chain from inventory assignment and pod retrieval through picking, confirmation and replenishment.

Evidence statusDeployment decision framework · site and workflow validation requiredLast reviewed: 14 August 2026
09

FUURAA thesis

Moving storage reduces walking only when inventory accuracy, station balance and replenishment hold together.

Engineering map

Turn the title into engineering objects that can be observed, measured and reviewed.

Each layer states the boundary to establish and the evidence needed for the next decision.

01

Inventory

Verify location, quantity, reservation and reconciliation.

02

Station

Balance presentation, pick confirmation and queueing.

03

Replenishment

Prevent starvation, misplacement and unsafe access.

Verification questions

Write the questions first, then decide whether a demo, test, pilot or operating record can answer them.

Each question needs an object, conditions, denominator, threshold and accountable decision owner.

  1. 01

    How often is the requested inventory absent?

  2. 02

    What sets station capacity?

  3. 03

    How are pick errors detected?

  4. 04

    Can replenishment proceed safely at peak?

Evidence to preserve

Enable the next reader to reconstruct conditions, results, failures and the decision.

A conclusion alone loses reviewability; raw records, configuration and exclusions matter too.

  1. 01

    Evidence package 1

    Complete workflow protocol

  2. 02

    Evidence package 2

    Inventory, queue and pick-quality data

  3. 03

    Evidence package 3

    Replenishment exception record

Scope boundary

State what this evidence still cannot be generalised to.

Sources and evidence status

Read standards scope, measurement evidence and application conclusions separately.

Source dates and review status remain visible; external sources open in a new tab.