Lifecycle economics

Include facility work, integration, support, batteries, spares, training, downtime and vendor-exit costs.

Evidence statusDeployment decision framework · site and workflow validation requiredLast reviewed: 14 August 2026
17

FUURAA thesis

Robot price is a small and often misleading slice of the deployment decision.

Engineering map

Turn the title into engineering objects that can be observed, measured and reviewed.

Each layer states the boundary to establish and the evidence needed for the next decision.

01

Baseline

Measure the current service, quality, labour and risk cost.

02

Total cost

Track capital, integration, operations, change and exit.

03

Value

Attribute throughput, quality, resilience and safety outcomes.

Verification questions

Write the questions first, then decide whether a demo, test, pilot or operating record can answer them.

Each question needs an object, conditions, denominator, threshold and accountable decision owner.

  1. 01

    What costs sit outside the robot contract?

  2. 02

    How sensitive is value to utilisation?

  3. 03

    What happens after vendor or interface change?

  4. 04

    Are safety and quality losses monetised transparently?

Evidence to preserve

Enable the next reader to reconstruct conditions, results, failures and the decision.

A conclusion alone loses reviewability; raw records, configuration and exclusions matter too.

  1. 01

    Evidence package 1

    Comparable baseline and assumptions

  2. 02

    Evidence package 2

    Versioned total-cost model

  3. 03

    Evidence package 3

    Realised-benefit and sensitivity review

Scope boundary

State what this evidence still cannot be generalised to.