Operating zone before route

Specify floors, crossings, blind corners, docks, doors, loads, people and environmental limits before approving navigation.

Evidence statusDeployment decision framework · site and workflow validation requiredLast reviewed: 14 August 2026
02

FUURAA thesis

For driverless industrial trucks, the prepared operating zone is part of the safety system.

Engineering map

Turn the title into engineering objects that can be observed, measured and reviewed.

Each layer states the boundary to establish and the evidence needed for the next decision.

01

Geometry

Map width, clearance, slopes, edges and escape routes.

02

Traffic

Record pedestrians, forklifts, doors and right-of-way rules.

03

Conditions

Bound friction, lighting, dust, temperature and communications.

Verification questions

Write the questions first, then decide whether a demo, test, pilot or operating record can answer them.

Each question needs an object, conditions, denominator, threshold and accountable decision owner.

  1. 01

    Which zones are inside the intended scope?

  2. 02

    What changes require reassessment?

  3. 03

    Where can people unexpectedly enter?

  4. 04

    How is emergency access preserved?

Evidence to preserve

Enable the next reader to reconstruct conditions, results, failures and the decision.

A conclusion alone loses reviewability; raw records, configuration and exclusions matter too.

  1. 01

    Evidence package 1

    Versioned operating-zone drawing

  2. 02

    Evidence package 2

    Traffic and hazard assessment

  3. 03

    Evidence package 3

    Change-control and inspection record

Scope boundary

State what this evidence still cannot be generalised to.

Sources and evidence status

Read standards scope, measurement evidence and application conclusions separately.

Source dates and review status remain visible; external sources open in a new tab.