Version & configuration
Requirements, CAD, models, software, parameters, BOM and as-built configurations use stable identifiers with change impact.
Engineering & manufacturing · Product development path
This is not a catalogue of drawings to copy blindly. It is an engineering evidence chain connecting requirements, digital models, simulation, prototype manufacturing and safe release. Every stage states its inputs, deliverables, review questions and stop conditions.
Core principle
Buildable is not the same as safe to operate; demonstrable is not the same as repeatably deliverable. FUURAA connects every phase to inspectable artefacts and sources so readers can see what is known, what remains uncertain and what work comes next.
Five review gates
Read sequentially or enter at the project’s current stage. A later phase cannot repair a foundational assumption that was never made visible earlier.
Turn a promising robot idea into a measurable job, a bounded operating environment and a reviewable evidence plan before selecting hardware.
Open stage →02Gate 02Translate requirements into a versioned system architecture that connects mechanics, electronics, compute, software, data and human control.
Open stage →03Gate 03Use simulation as a controlled evidence instrument: expose assumptions, inject failures, compare against reality and preserve reproducible results.
Open stage →04Gate 04Turn controlled models into a reproducible physical prototype with a traceable bill of materials, assembly process, calibration and quality evidence.
Open stage →05Gate 05Assemble a claim–argument–evidence case, release only within approved boundaries and keep evidence current as hardware, software and operations change.
Open stage →Evidence spine across the lifecycle
Requirements, CAD, models, software, parameters, BOM and as-built configurations use stable identifiers with change impact.
Every external design, codebase, dataset, mesh and model records owner, version, terms, modifications and distribution decision.
Every consequential requirement connects to analysis, inspection, demonstration or test evidence; open items stay visible.
Hazards, assumptions, residual risk, reviewers, approved scope and stop conditions remain current.
Field interventions, near misses, failures, repairs, model drift and environment change flow back into engineering evidence.
Boundary of public knowledge